| 注册
首页|期刊导航|水道港口|黄河上游双旋沟滩航道整治方案模型试验研究

黄河上游双旋沟滩航道整治方案模型试验研究

杨振华 王平义 喻涛

水道港口Issue(5):517-521,5.
水道港口Issue(5):517-521,5.

黄河上游双旋沟滩航道整治方案模型试验研究

Model test of channel regulation scheme for Shuangxuangou rapids in upstream of the Yellow River

杨振华 1王平义 1喻涛1

作者信息

  • 1. 重庆交通大学河海学院,重庆 400074
  • 折叠

摘要

Abstract

In order to determine channel regulation engineering proposal of Shuangxuangou rapids,which is the most serious navigation⁃obstructing hazardous rapids and shoal reach between Longwan and Nanchangtan in the upstream of the Yellow River,the fixed bed river model test was carried out. In this paper,the hydraulic elements of the rapids were studied by flow test,and the stability of dredged channel was analyzed by sediment transport test. The test result shows that the regulation measures such as dredging the shallow zone,cutting the protrusive rock,fill⁃ing the deep bay,building the submerged dike in deep trough and spur dike in broadened section can reduce flow velocity and water surface gradient,improve flow state and increase channel width. After regulation,the channel condition of the rapids reach can meet the grade V navigation standard,and the hydraulic elements of the rapids reach can meet the needs of ship passing through rapids.

关键词

航道整治/浅滩/模型试验/双旋沟滩

Key words

channel regulation/shoal/model test/Shuangxuangou rapids

分类

交通工程

引用本文复制引用

杨振华,王平义,喻涛..黄河上游双旋沟滩航道整治方案模型试验研究[J].水道港口,2014,(5):517-521,5.

水道港口

OACSTPCD

1005-8443

访问量0
|
下载量0
段落导航相关论文