山东建筑大学学报Issue(4):336-340,5.
校园中水站曝气生物滤池的优化应用--以山东师范大学长清校区中水站为例
Optimization applications of BAF in intermediate-water station of campus:A case of reclaimed water station in Changqing campus, Shandong Normal University
李春燕 1韩庆祥2
作者信息
- 1. 山东师范大学 基建处,山东 济南250014
- 2. 山东建筑大学 市政与环境工程学院,山东 济南250101
- 折叠
摘要
Abstract
Through the practice of intermediate-water reuse works in the BAF( biological aerated filter) for debugging, its optimum operating condition parameters were abtained for wastewater treatment,and reuse university has a certain meaning and value with engineering design and actual production run. The paper debugging analyzed the BAF in reclaimed water station of Changqing campus of Shandong Normal University. Changing BAF aeration by controlling the flow valve and pressure relief valve on the water pipe aeration pipes to study impact of gas-water ratio on the processing performance of BAF. In capacity of BAF remains unchanged,change its water flow,thus changing the HRT to study impact of HRT( Hydraulic retention time)on the processing performance of BAF. The results show that is whar BAF gas-water ratio of 4. 0 to 5. 5:1 range,CODcr( Chemical oxygen dimand)removal rate is 86. 7% ~90. 1%,and SS(Suspended solid)removal efficiency of up to 48 . 4% ~64 . 8% under the conditions of temperature of 23~29 ℃. When HRT is 3 . 0 ~ 4 . 0 h range,CODcr removal rate is 85. 8% ~91. 3%,and the removal efficiency of SS is up to 54. 0% ~57 . 7 under the conditions of temperature of 23~29 ℃.关键词
中水回用/曝气生物滤池/运行参数/优化/BAFKey words
intermediate-water reuse/BAF/operation parameters/optimization分类
资源环境引用本文复制引用
李春燕,韩庆祥..校园中水站曝气生物滤池的优化应用--以山东师范大学长清校区中水站为例[J].山东建筑大学学报,2014,(4):336-340,5.