Abstract
It affects the underground mining safety production of for the river to flow through 1930 coal mine. Through the analysis of the landform, the geological conditions, the surface water lfow, and other building facilities of the river bed basin, using numerical simulation to predict the height of water lfowing fractured zone, which show that the maximum height of fracture mining zone is 83m in the simulation area under, after compared with the measured result using the drill hole, the result is accordant to practice. The research method for other similar mines mining has reference function.关键词
水体下/导水裂隙带/数值模拟Key words
under source of water/water lfowing fractured zone/numerical simulation分类