| 注册
首页|期刊导航|山东煤炭科技|红庆梁矿井通风设备选型设计方案

红庆梁矿井通风设备选型设计方案

李德臣

山东煤炭科技Issue(11):106-107,110,3.
山东煤炭科技Issue(11):106-107,110,3.DOI:10.3969/j.issn.1005-2801.2014.11.46

红庆梁矿井通风设备选型设计方案

Selection Scheme of Ventilation Equipment for Hongqingliang Mine

李德臣1

作者信息

  • 1. 北京昊华能源股份有限公司红庆梁煤矿,北京 102300
  • 折叠

摘要

Abstract

The two sets of design are given according to Hong Qing Liang mine that air lfow and negative required during the construction of well. The programs of selection recommended make more scientiifc and reasonable by comparative analysis. Ventilation capacity, motor type, power, pipeline drag coefifcient, operating point parameters, power consumption and anti-wind measures of the selected fan are accounted that the ventilation problems have been resolved during well construction and large coal mine safety production process which provide valuable experience for similar equipment selection and construction of the mine ventilation.

关键词

矿井/通风设备/选型设计

Key words

mine/ventilation equipment/selection scheme

分类

矿业与冶金

引用本文复制引用

李德臣..红庆梁矿井通风设备选型设计方案[J].山东煤炭科技,2014,(11):106-107,110,3.

山东煤炭科技

1005-2801

访问量0
|
下载量0
段落导航相关论文