山东煤炭科技Issue(1):197-198,200,3.DOI:10.3969/j.issn.1005-2801.2015.01.86
济宁三号煤矿选煤厂块煤浅槽分选系统技术应用
Research and Technological transformation of lump coal separation system in Jining No.3 coal preparation plant
王东 1宁广强 1金吉元1
作者信息
- 1. 兖州煤业股份有限公司济宁三号煤矿,山东 济宁 272069
- 折叠
摘要
Abstract
Because the Washing raw coal in Jining no.3 coal preparation plant is instability,the original lump coal separation system is not perfect,The separation accuracy is low.The equipment is aging. These can not meet the needs of lump coal separation system.According to the coal quality data of Jining no.3 coal preparation plant. Analysis of the technical transformation scheme and the design of process system.Moving sieve jig with a shallow groove separation machine instead. After the technical transformation, the adaptability to the coal quality variation of separation is Improved. The maintenance of the equipment is reduced.And the level of automation system is Improved.关键词
块煤/分选/技术改造/重介质浅槽分选机Key words
the lump coal/separation/technological transformation/shallow groove separation machine分类
矿业与冶金引用本文复制引用
王东,宁广强,金吉元..济宁三号煤矿选煤厂块煤浅槽分选系统技术应用[J].山东煤炭科技,2015,(1):197-198,200,3.