山东煤炭科技Issue(2):60-62,3.DOI:10.3969/j.issn.1005-2801.2015.02.28
综放工作面破碎顶板加固技术研究
Reinforcement Technology for Broken roof of fully-mechanized face
侯民川1
作者信息
- 1. 山东省三河口矿业有限责任公司,山东 微山 277605
- 折叠
摘要
Abstract
In the process of mining fully mechanized top coal caving face, if meet the geological structure belt or advancing speed is too slow , will cause the broken roof, the increase of tip-to-face distance, spalling, roof leakage, even to caving to hollow upon the safety bracket, which buried the huge hidden trouble. Sanhekou coal mine using Ma Li pre-grouting to keep the integrity the roof made a success, and achieved good economic and social benefits.关键词
综放面/加固/破碎顶板/马丽散Key words
fully mechanized top coal caving face/reinforcing/broken roof/Ma Lisan分类
矿业与冶金引用本文复制引用
侯民川..综放工作面破碎顶板加固技术研究[J].山东煤炭科技,2015,(2):60-62,3.