弃水电量的成因分析计算法

吴东平 杨强

水力发电Issue(12):71-74,4.
水力发电Issue(12):71-74,4.

弃水电量的成因分析计算法

Analyses on the Causes and Calculation Methods of Abandoned Water Power

吴东平 1杨强2

作者信息

  • 1. 云南电力调度控制中心,云南 昆明 650011
  • 2. 云南电网公司电力交易中心,云南 昆明 650011
  • 折叠

摘要

Abstract

Based on the causes of water abandon of hydropower station, the impacts of each aspect of hydropower production on abandoned water power are analyzed. The classification principles of abandoned water power are proposed and the calculating methods of abandoned water power for hydropower stations with different regulation capacity are also developed. The case calculations show that the calculation methods can objectively reflect actual amount of abandoned water power of different type of hydropower station and avoid the unavailable water being counting in abandoned water.

关键词

弃水电量/不可用来水/恒定极限出力/调峰弃水

Key words

abandoned water power/unavailable water/constant limit output/peak abandoned water

分类

信息技术与安全科学

引用本文复制引用

吴东平,杨强..弃水电量的成因分析计算法[J].水力发电,2014,(12):71-74,4.

水力发电

OA北大核心CSTPCD

0559-9342

访问量0
|
下载量0
段落导航相关论文