水力发电Issue(12):79-82,4.
基于WSR-灰色聚类综合法的水电工程进度风险评估
Risk Assessment of Hydropower Project Schedule Based on WSR-Gray Clustering
贾立敏 1王巧珍 1向想想 1杨叶1
作者信息
- 1. 三峡大学经济与管理学院,湖北 宜昌 443000
- 折叠
摘要
Abstract
The precise risk assessment and the determination of key risk factors are essential for the effective progress target control in the schedule management of hydropower project construction. The WSR system methodology is adopted to classify the risk factors for hydropower construction process on three dimensions, and as a basis, the gray assessment system is then built. By applying the gray clustering method based on Triangle Whiten Function to evaluate the overall objective of system and all risk factors, the risk level of project overall progress are determined and the risk factors with higher degree are also identified. The method is verified by an actual project.关键词
水电工程/进度管理/物理-事理-人理系统方法论/灰色聚类Key words
hydropower project/schedule management/WSR/gray clustering分类
建筑与水利引用本文复制引用
贾立敏,王巧珍,向想想,杨叶..基于WSR-灰色聚类综合法的水电工程进度风险评估[J].水力发电,2014,(12):79-82,4.