水力发电Issue(12):90-93,4.
小湾高拱坝库盘变形作用效应研究与探索
Research and Exploration on the Action Effects of Reservoir Basin Deformation on Xiaowan High Arch Dam
张礼兵 1沈静 2赵二峰 3杨姗姗1
作者信息
- 1. 中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650051
- 2. 云南省移民开发技术服务中心,云南 昆明 650051
- 3. 河海大学,江苏 南京 210098
- 折叠
摘要
Abstract
Based on the measured reservoir basin deformation data of Xiaowan Hydropower Station, the deformation law and magnitude of reservoir basin deformation and the action effects on Xiaowan high arch dam are analyzed by using numerical simulation method. The results show the reservoir basin deformation has an impact on dam deformation behavior, the huge water load leads to the warping deformation of reservoir basin with the settlement before the dam greater than the settlement behind the dam and leads to the arch dam being tilted towards the upstream direction.关键词
拱坝/库盘变形/作用效应/小湾水电站Key words
arch dam/reservoir basin deformation/action effect/Xiaowan Hydropower Station分类
建筑与水利引用本文复制引用
张礼兵,沈静,赵二峰,杨姗姗..小湾高拱坝库盘变形作用效应研究与探索[J].水力发电,2014,(12):90-93,4.