In hydraulic fill reclamation projects, the construction duration is long when the vacuum preloading method is used to improve soft ground and hydraulic fill. However, the effectiveness of improvement is relatively poor. To overcome these problems, a ground treatment technique is proposed for land reclamations with hydraulic fills on soft soils. This technique utilizes the hydraulic fills as a surcharge loading for the soft soils, and then synchronously applies vacuum preloading to both the soft soils and the hydraulic fills. By using this technique, two separate construction phases of improving soft soils and hydraulic fills are merged into a single construction period. Thus, construction time can be greatly shortened. Field test results show that the proposed technique effectively eliminates the influence of excessive deformations of the upper hydraulic fills on the improvement effectiveness of the lower soft soils in the conventional vacuum preloading technique. With no recourse to any other surcharge materials, the soft soils can be improved by vacuum combined surcharge preloading. It further promotes the effectiveness of soil improvement.关键词
同步加固技术/软土地基/堆载预压/吹填淤泥/真空预压Key words
synchronous soil improvement technique/soft ground/surcharge preloading/hydraulic fills/vacuum preloading分类
建筑与水利引用本文复制引用
付冠杰,范明桥,李杰,徐锴,雷国辉..软土地基堆载吹填淤泥并同步真空预压加固技术[J].水利水电科技进展,2014,(6):82-88,7.基金项目
高等学校学科创新引智计划(B13024) (B13024)
水利部公益性行业科研专项(201201015) (201201015)
中央高校基本科研业务费专项(2014B04914) (2014B04914)