水利水电科技进展Issue(1):85-88,94,5.DOI:10.3880/j.issn.10067647.2015.01.015
基于多重迭代算法的梯级水库群调度图优化方法
Operation chart optimization method of cascade reservoirs based on multiple iteration algorithm
摘要
Abstract
Based on the normal operation charts of cascade reservoirs, we proposed a mathematical model of optimal operation chart aiming to reach at the maximum value of annual average electricity generation. In this regard, we suggested a solving algorithm to reduce dimensionalities based on multiple iterations as follow: reduce spatial multi-reservoir dimensionality by iteration in reservoir turns;reduce multi-curve dimensionality by iteration in rule curve turns;and reduce multi-state dimensionality of rule curve with progressive optimality algorithm. Overall, results based on experiments considering Wananxi-Baisha cascade reservoirs as a case studies show that this optimum method provides optimal operation charts of cascade reservoirs in rational form as well as significant increases in electricity generation of the reservoir group while compared with traditional method.关键词
梯级水库群/调度图优化/多重迭代算法/万安溪水库/白沙水库Key words
cascade reservoirs/operation chart optimization/multiple iterations algorithm/Wananxi Reservoir/Baisha Reservoir分类
建筑与水利引用本文复制引用
刘烨,钟平安,郭乐,万新宇..基于多重迭代算法的梯级水库群调度图优化方法[J].水利水电科技进展,2015,(1):85-88,94,5.基金项目
国家重点基础研究发展计划(973计划)(2013CB036406,2010CB951102) (973计划)
国家自然科学基金(51179044) (51179044)