水利学报Issue(4):419-426,8.DOI:10.13243/j.cnki.slxb.2014.04.006
超高面板堆石坝面板地震应力改善措施研究
Study on aseismic measures of high concrete-face rockfill dam
摘要
Abstract
In order to ensure the safe operation of high CFRD during earthquake, it’s one of the key is-sues of the CFRD (concrete-face rockfill dam)higher than 200 m to adopt reasonable measures for reducing seismic stress of face-slab effectively based on the understanding of the static and dynamic stress distribu-tion characteristics and regular pattern of face-slab. In this study, aseismic measure of the horizontal joint in face-slabs at the optimal position(elevation) combined with flexible reinforcement in rockfill is proposed, according to the distribution of dynamic stress. A three-dimensional static and dynamic finite element analyt-ical method is employed to research the effects of the position(elevation) and length of the horizontal joint for 300 m high CFRD. Based on the analysis of different geometrical characteristic parameters dams, it can be concluded that the effective position(elevation) of horizontal joint is located in central dam sections of 0.7~0.85 H(H is dam height),effective length is 0.3 L(L is dam axial length).关键词
面板堆石坝/有限元/面板应力/抗震措施Key words
concrete-faced rockfill dam/finite element/stress of face-slab/aseismic measures分类
建筑与水利引用本文复制引用
孔宪京,张宇,邹德高..超高面板堆石坝面板地震应力改善措施研究[J].水利学报,2014,(4):419-426,8.基金项目
国家自然科学基金资助项目(51379028,91215301,51279025);新世纪优秀人才支持计划资助 ()