水利学报Issue(7):844-849,6.DOI:10.13243/j.cnki.slxb.2014.07.011
南水北调来水条件下北京市多水源联合调度模型研究
Joint operation model of multiple water sources in Beijing
摘要
Abstract
As the Mid-route of South-to-North Water Transfer Project (SNWTP) diverts water to Beijing in 2014, Beijing will accordingly establish an integrated water supply system which consists of diverted wa-ter, local surface water and ground water. It will improve the reliability of water supply while impose new challenges. Inflow from SNWTP is determined after the regulating of the whole project, which is essential to the water supply system. In this paper, joint operation model aimed at the multiple water sources opera-tion in Beijing is established. The results show that (a) operation is highly reliable with no water shortage or water desertion in the water supply system;(b) the period of mixed water supply from local source and SNWTP lasts from 1 to 100 days under different inflow conditions;and (c) the period when the No. 9 wa-terworks and the water plants near the south main canal receive mixed water supply is longer than that of other water plants.关键词
多水源联合调度/南水北调/调度规则/多水源配置Key words
joint operation model of multiple water sources/South-to-North Water Transfer Project/regu-lating rules/allocation of multiple water sources分类
建筑与水利引用本文复制引用
章燕喃,田富强,胡宏昌,齐子超..南水北调来水条件下北京市多水源联合调度模型研究[J].水利学报,2014,(7):844-849,6.基金项目
北京市科技委员会课题(D101106047210001)资助 (D101106047210001)