This paper illustrated the process design of Chuanyanghe rolling stock base of Shanghai urban rail transit, from functional orientation, overall plan, process flow of operation and maintenance, main facility and other relevant aspects. And emphatically, this paper elaborated the characteristics of process design under the condition of multiple-line resource sharing. Then this paper came to the conclusion:the specific contents of three-line resource sharing as well as their interface dividing should be clearly determined based on the principle of“network having priority over single line”, and should be combined with each line's network planning, functional orientation, construction's sequence and other factors, so as to achieve three-line resource sharing in terms of the inspection and repairing facility, comprehensive maintenance facility, material storage facility, the living and working facility, etc.关键词
城市轨道交通/车辆基地/工艺设计/资源共享Key words
urban rail transit/rolling stock base/process design/resource sharing分类
交通工程