铁道标准设计Issue(3):17-21,22,6.DOI:10.13238/j.issn.1004-2954.2015.03.004
银西线引入西安枢纽货运系统方案研究
Analysis of Freight System Program of Yinxi Railway into Xi’an Railway Hub
刘海芳1
作者信息
- 1. 中铁第一勘察设计院集团有限公司线运处,西安 710043
- 折叠
摘要
Abstract
In view of the current situations of Xi’an railway hub and existing main problems, this paper analyzes the plan to set up through-yard in Lingkou, Leyang and Xiangqiao stations with reference to the overall planning of Xi’an railway hub, the existing freight facilities and the capacity of the existing north circular line. According to the hub productivity distribution and other factors such as engineering implementation and project investment, it is proposed to set up a through-yard in Leyang station.关键词
铁路/西安枢纽/货运第二双线/直通场/方案研究Key words
Railway/Xi’an railway hub/Second freight double line/Through yard/Program study分类
交通工程引用本文复制引用
刘海芳..银西线引入西安枢纽货运系统方案研究[J].铁道标准设计,2015,(3):17-21,22,6.