铁道标准设计Issue(3):50-53,4.DOI:10.13238/j.issn.1004-2954.2015.03.012
贵阳轨道交通1号线钢弹簧浮置板轨道过渡段合理设置方式研究
Setting of Transition Section of Spring-steel Floating Slab Track on Guiyang Rail Transit Line 1
摘要
Abstract
The big difference of stiffness between the short sleeper monolithic track bed and the spring-steel floating slab track foundation calls for a transition section for smooth transition of the stiffness under the rail. The author, based on the short sleeper monolithic track bed and the spring-steel floating slab track that are widely used in Guiyang rail transit line 1 , sets up a mechanics model of transition section between the short sleeper monolithic track bed and the spring-steel floating slab track. This paper analyzes the influence of different length, classification and speed on the transition section with the finite-element method. At the same time, the pattern of transition section with encryption steel spring bearing in combination with fasteners on the side of sleeper monolithic track bed is also analyzed. The results show that different length and classification have different impact on the performance of the transition section. The pattern of transition section of encryption steel spring in combination with fasteners is better than that of only encryption steel spring.关键词
短轨枕式整体道床/钢弹簧浮置板/过渡段/减振扣件Key words
Short sleeper monolithic track bed/Spring-steel floating slab/Transition section/Damping fasteners分类
交通工程引用本文复制引用
刘笑凯,任娟娟,潘国瑞,庞玲..贵阳轨道交通1号线钢弹簧浮置板轨道过渡段合理设置方式研究[J].铁道标准设计,2015,(3):50-53,4.基金项目
中铁二院科研项目(科2013-36) (科2013-36)
中国铁路总公司科技开发重点项目(2013G008-C) (2013G008-C)
中央高校基本科研业务费专项资金科技创新项目(A0920502051308-46) (A0920502051308-46)