| 注册
首页|期刊导航|铁道标准设计|超大跨度铁路桥梁列车加载长度研究

超大跨度铁路桥梁列车加载长度研究

李桂林

铁道标准设计Issue(3):64-67,68,5.
铁道标准设计Issue(3):64-67,68,5.DOI:10.13238/j.issn.1004-2954.2015.03.015

超大跨度铁路桥梁列车加载长度研究

Research on Train loading Length on Super-long Span Railway Bridge

李桂林1

作者信息

  • 1. 中铁第四勘察设计院集团有限公司,武汉 430063
  • 折叠

摘要

Abstract

The loading length on super-long span railway bridge plays an important role in determining the cross section and cost of super-long span bridges and it is necessary to analyze the train loading length for bridges of over 1km long. The research aims to find out a suitable loading mode for super-long span bridges under medium-live load and ZK load. The research concludes that the Intercity and passenger dedicated railway lines may use 450 meters loading length. The loading length for railway lines of mixed passenger and freight and freight dedicated railway lines may be determined based on the formation of the freight train, and the effective length of railway station may be taken as the super-long bridge’s loading length. For bridges with the main bridge less than 3km, only one loading length is added.

关键词

铁路桥梁/加载长度/超大跨度/客运专线铁路/客货共线铁路

Key words

Railway bridges/Loading length/Super-long span/Passenger dedicated line/Railway line for mixed passenger and freight traffic

分类

交通工程

引用本文复制引用

李桂林..超大跨度铁路桥梁列车加载长度研究[J].铁道标准设计,2015,(3):64-67,68,5.

基金项目

铁四院科技研究开发计划项目(2012K29) (2012K29)

铁道标准设计

OA北大核心

1004-2954

访问量4
|
下载量0
段落导航相关论文