岩溶隧道突水突泥预报综合评估
Comprehensive Assessment of Prediction of Water and Mud Bursting in Karst Tunnel
舒森1
作者信息
- 1. 中铁二院工程集团有限责任公司,成都 610031
- 折叠
摘要
Abstract
A model is established for comprehensive evaluation of prediction of water and mud bursting in karst tunnel based on AHP to analyze geological factors for water and mud bursting, the comprehensive prediction and forecast interpretation. With the analysis of interaction between them, the interpretation of various factors is studied to assess the impact weight of water and mud bursting. According to the evaluation of different forecast interpretations together with the impact weight of the entire assessment system, comprehensive assessment conclusions are obtained from the assessed section. Studies show that hierarchy-based assessment can be used for comprehensive forecast interpretation of various factors, to assess the possibility of water and mud bursting in karst section, and to assess dynamically the prediction in real-time.关键词
岩溶隧道/突水突泥/综合评估/层次分析法Key words
Karst tunnel/Water and mud bursting/Comprehensive assessment/Analytic Hierarchy-based assessment分类
交通工程引用本文复制引用
舒森..岩溶隧道突水突泥预报综合评估[J].铁道标准设计,2015,(4):72-78,79,8.