铁道标准设计Issue(5):54-59,60,7.DOI:10.13238/j.issn.1004-2954.2015.05.012
三塘湖矿区煤炭集运方案研究
Study of Coal Collection and Transportation Program for Santanghu Mine
史晓涛1
作者信息
- 1. 中铁第一勘察设计院集团有限公司线运处,西安 710043
- 折叠
摘要
Abstract
Jiangha’e Railway is the north corridor and a trunk line to transport coal out of Xinjiang, connecting the coal lines at Santanghu Mine. According to the functionalities and goals of Jiangha’e Railway and on the basis of the mine planning and corridor technical standards, this paper analyses the alignment of lines and layout of stations, studies the general plan of coal lines at Santanghu Mine so as to allow the combination of the railway corridor with the coal lines in various coal mines to form a effective coal transport system.关键词
将哈额铁路/新疆北通道/三塘湖矿区/煤炭集运Key words
Jiangha’e Railway/Xinjiang North Corridor/Santanghu Mine/Coal collection and transpor-tation分类
交通工程引用本文复制引用
史晓涛..三塘湖矿区煤炭集运方案研究[J].铁道标准设计,2015,(5):54-59,60,7.