| 注册
首页|期刊导航|铁道标准设计|三塘湖矿区煤炭集运方案研究

三塘湖矿区煤炭集运方案研究

史晓涛

铁道标准设计Issue(5):54-59,60,7.
铁道标准设计Issue(5):54-59,60,7.DOI:10.13238/j.issn.1004-2954.2015.05.012

三塘湖矿区煤炭集运方案研究

Study of Coal Collection and Transportation Program for Santanghu Mine

史晓涛1

作者信息

  • 1. 中铁第一勘察设计院集团有限公司线运处,西安 710043
  • 折叠

摘要

Abstract

Jiangha’e Railway is the north corridor and a trunk line to transport coal out of Xinjiang, connecting the coal lines at Santanghu Mine. According to the functionalities and goals of Jiangha’e Railway and on the basis of the mine planning and corridor technical standards, this paper analyses the alignment of lines and layout of stations, studies the general plan of coal lines at Santanghu Mine so as to allow the combination of the railway corridor with the coal lines in various coal mines to form a effective coal transport system.

关键词

将哈额铁路/新疆北通道/三塘湖矿区/煤炭集运

Key words

Jiangha’e Railway/Xinjiang North Corridor/Santanghu Mine/Coal collection and transpor-tation

分类

交通工程

引用本文复制引用

史晓涛..三塘湖矿区煤炭集运方案研究[J].铁道标准设计,2015,(5):54-59,60,7.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文