| 注册
首页|期刊导航|铁道标准设计|高速铁路无砟轨道底座板整体抬升方案设计及试验研究

高速铁路无砟轨道底座板整体抬升方案设计及试验研究

董明

铁道标准设计Issue(5):60-64,5.
铁道标准设计Issue(5):60-64,5.DOI:10.13238/j.issn.1004-2954.2015.05.013

高速铁路无砟轨道底座板整体抬升方案设计及试验研究

Design and Experimental Study on Uplifting Base Plate of High Speed Railway Ballastless Track

董明1

作者信息

  • 1. 北京中铁瑞威基础工程有限公司,北京 100055
  • 折叠

摘要

Abstract

In the face of the integral sinking of ballastless track structure due to settlement of subgrade on some high speed railway lines, a remediation method is proposed to uplift the base plate of ballastless track and grout under the plate. The uplifting scheme is determined with numerical simulation and structural mechanics computation. Full scale model test and short size model test are conducted respectively, and the rationality and feasibility of the scheme are verified by the test results, which provide theoretical and practical references for later on-track construction.

关键词

无砟轨道/底座板/抬升/注浆/试验

Key words

Ballastless track/Base plate/Uplift/Grout/Test

分类

交通工程

引用本文复制引用

董明..高速铁路无砟轨道底座板整体抬升方案设计及试验研究[J].铁道标准设计,2015,(5):60-64,5.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文