| 注册
首页|期刊导航|铁道标准设计|兰州铁路枢纽客运系统再研究

兰州铁路枢纽客运系统再研究

李红谍

铁道标准设计Issue(6):6-10,11,6.
铁道标准设计Issue(6):6-10,11,6.DOI:10.13238/j.issn.1004-2954.2015.06.002

兰州铁路枢纽客运系统再研究

Research on Passenger Transport System of Lanzhou Railway Terminal

李红谍1

作者信息

  • 1. 中铁第一勘察设计院集团有限公司线路运输处,西安 710043
  • 折叠

摘要

Abstract

With reference to the adjustment related to Lanzhou railway terminal network and according to the passenger transport layout and related line conditions of Lanzhou railway terminal, the capacity of passenger stations, the capacity of section lines, the routes of cross-line passenger trains within the terminal are calculated and checked out, which have lead to the conclusion that the size of the lanzhouxi yard and the capacity of the lines can meet the requirement for network adjustment, but the existing facilities in Lanzhou passenger station can hardly allow Lanxin second line to be opened by the end of 2014 and passenger trains from Lanzhou-zhongchuan-zhangye railway can hardly cross over to Baoji-lanzhou passenger dedicated line. Thus, solutions and suggestions are put forward.

关键词

兰州铁路枢纽/客运系统/铁路网

Key words

Lanzhou railway terminal/Passenger transport system/Railway network

分类

交通工程

引用本文复制引用

李红谍..兰州铁路枢纽客运系统再研究[J].铁道标准设计,2015,(6):6-10,11,6.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文