| 注册
首页|期刊导航|铁道标准设计|煤炭集运站到发线能力计算方法探析

煤炭集运站到发线能力计算方法探析

吴琪

铁道标准设计Issue(6):36-39,4.
铁道标准设计Issue(6):36-39,4.DOI:10.13238/j.issn.1004-2954.2015.06.009

煤炭集运站到发线能力计算方法探析

Study on Calculating Siding Capacity of Coal Loading Station

吴琪1

作者信息

  • 1. 中铁工程设计咨询集团有限公司,北京 100055
  • 折叠

摘要

Abstract

With reference to a tandem coal loading station and on the basis of the analysis of its operations, such three methods as Task Hours Count, Gantt Chart and Full-day Task Drawing are employed to calculate the siding capacity of the coal loading station. The results show that Task Hours Count is a rough method, which is proposed to calculate the siding scale in planning and scheme studying , while the calculations conducted with Gantt Chart and Full-Day Task Drawing are authentic and reliable, thus these two should be applied in preliminary design to calculate the siding scale.

关键词

集运站/到发线能力/计算方法/作业时分法/甘特图法/全日作业图法

Key words

Loading station/Siding capacity/Calculation method/Task Hours Count/Gantt Chart/Full-day Task Drawing

分类

交通工程

引用本文复制引用

吴琪..煤炭集运站到发线能力计算方法探析[J].铁道标准设计,2015,(6):36-39,4.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文