| 注册
首页|期刊导航|铁道标准设计|高速铁路接触网附加导线转换方案研究

高速铁路接触网附加导线转换方案研究

陈忠革 古晓东

铁道标准设计Issue(7):143-146,4.
铁道标准设计Issue(7):143-146,4.DOI:10.13238/j.issn.1004-2954.2015.07.032

高速铁路接触网附加导线转换方案研究

Approach to the Conversion of OCS Additive Wire on High-speed Railway

陈忠革 1古晓东2

作者信息

  • 1. 沈阳铁路局供电处,沈阳 110001
  • 2. 铁道第三勘察设计院集团有限公司,天津 300251
  • 折叠

摘要

Abstract

Research purposes and methods: Although the additive wire of OCS doesn’t contact with pantograph directly, its performances are closely related to traffic safety. In the early construction of high-speed railway in China, the design of the additive wire at converting point didn’t take into account all related issues and resulted in many problems. The paper, with reference to the design of additive wire conversion on different high speed lines with conventional tunnel profile and station layout, looks for the design suitable for lines with different conditions to guarantee the insulation distances between the additive wire and catenary, between the additive wire and buildings and to meet the requirements for economy and landscape at the same time. Research conclusions: with reference to standards, specifications and engineering practices, the paper conducts comparison of conversion designs of additive wire, and analysis of the design in many respects, such as the insulation distances, the difficulties in installation and construction, capital costs and landscape. Finally, depending on the comparison results, the paper offers recommended plans for different circumstances and provides references for future design and construction.

关键词

高速铁路/接触网/接触悬挂/附加导线/隧道

Key words

High-speed railway OCS/Catenary/Additive wire/Tunnel

分类

交通工程

引用本文复制引用

陈忠革,古晓东..高速铁路接触网附加导线转换方案研究[J].铁道标准设计,2015,(7):143-146,4.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文