| 注册
首页|期刊导航|铁道标准设计|关于既有线C2等级转换点设置的探讨

关于既有线C2等级转换点设置的探讨

朱春兰

铁道标准设计Issue(7):152-154,3.
铁道标准设计Issue(7):152-154,3.DOI:10.13238/j.issn.1004-2954.2015.07.034

关于既有线C2等级转换点设置的探讨

Approach to Setup of CTCS-2 Level Transition Point on Existing Railway

朱春兰1

作者信息

  • 1. 中铁第一勘察设计院集团有限公司,西安 710043
  • 折叠

摘要

Abstract

In order to ensure the benefit of high-speed railways and meet the demand of regional urban transportation, the projects to allow existing railway lines to run multiple unit trains are in a rise. Thus, the setup of CTCS level transition point becomes a subject in the design. With reference to the implementation of existing railway additional second-line of Jining-Baotou CTCS-2 train control system renovation project, the issue of CTCS-0 to CTCS-2 level transition point setup is addressed according to the actual situation, and the conclusion shows that the factors of operating speed and braking distance should be considered on the premise of meeting the demand of railway line transportation mode as well as improving the railway transport capacity as far as possible in CTCS level transition point setup scheme.

关键词

既有铁路/列控系统/等级转换点/设置/速度/制动距离

Key words

Existing railway/CTCS/Level transition point/Set up/Speed/Braking distance

分类

交通工程

引用本文复制引用

朱春兰..关于既有线C2等级转换点设置的探讨[J].铁道标准设计,2015,(7):152-154,3.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文