铁道标准设计Issue(7):152-154,3.DOI:10.13238/j.issn.1004-2954.2015.07.034
关于既有线C2等级转换点设置的探讨
Approach to Setup of CTCS-2 Level Transition Point on Existing Railway
朱春兰1
作者信息
- 1. 中铁第一勘察设计院集团有限公司,西安 710043
- 折叠
摘要
Abstract
In order to ensure the benefit of high-speed railways and meet the demand of regional urban transportation, the projects to allow existing railway lines to run multiple unit trains are in a rise. Thus, the setup of CTCS level transition point becomes a subject in the design. With reference to the implementation of existing railway additional second-line of Jining-Baotou CTCS-2 train control system renovation project, the issue of CTCS-0 to CTCS-2 level transition point setup is addressed according to the actual situation, and the conclusion shows that the factors of operating speed and braking distance should be considered on the premise of meeting the demand of railway line transportation mode as well as improving the railway transport capacity as far as possible in CTCS level transition point setup scheme.关键词
既有铁路/列控系统/等级转换点/设置/速度/制动距离Key words
Existing railway/CTCS/Level transition point/Set up/Speed/Braking distance分类
交通工程引用本文复制引用
朱春兰..关于既有线C2等级转换点设置的探讨[J].铁道标准设计,2015,(7):152-154,3.