铁道标准设计Issue(7):155-158,159,5.DOI:10.13238/j.issn.1004-2954.2015.07.035
宜昌东至凉雾段开行动车信号技术设备改造方案探讨
Discussion on Signal Equipment Upgrading Program for Running EMU on Yichangdong to Liangwu Railway Line
余红梅 1蔡红标 2徐红新3
作者信息
- 1. 武汉铁路职业技术学院,武汉 430205
- 2. 武汉铁路局电务处TDCS/CTC中心,武汉 430071
- 3. 中铁第四勘察设计院集团有限公司通号处,武汉 430063
- 折叠
摘要
Abstract
EMU operating conditions has not been fulfilled for EMU when the section was designed to open between Yichangdong and Liangwu on Shanghai-Wuhan-Chengdu high-speed rail line in 2010 , which has made it impossible to run high speed EMU on the entire rail line. Through the analysis and study of onsite signal equipment of Yichangdong-Liangwu section and that at the ends of adjacent lines of Han ~ Yi and Yu ~ Li, the paper puts forward three schemes for implementing signal technical adaptability upgrading to run EMU, and selects scheme one to design the upgrading details according to progress schedule.关键词
动车/信号技术设备/方案/改造Key words
EMU/Signal technical equipment/Scheme/Upgrading分类
交通工程引用本文复制引用
余红梅,蔡红标,徐红新..宜昌东至凉雾段开行动车信号技术设备改造方案探讨[J].铁道标准设计,2015,(7):155-158,159,5.