| 注册
首页|期刊导航|铁道标准设计|兰合铁路刘家峡黄河特大桥主桥设计分析

兰合铁路刘家峡黄河特大桥主桥设计分析

王克辉

铁道标准设计Issue(8):88-91,92,5.
铁道标准设计Issue(8):88-91,92,5.

兰合铁路刘家峡黄河特大桥主桥设计分析

Design Analysis of Liujiaxia Yellow River Main Bridge on Lanzhou-Hezuo Railway

王克辉1

作者信息

  • 1. 中铁第一勘察设计院集团有限公司,西安 710043
  • 折叠

摘要

Abstract

The Liujiaxia Yellow River Bridge is one of the key projects of newly built railway from Lanzhou to Hezuo. It is located in high seismic intensity region. The main bridge is (100+180+100)m of continuous rigid frame to cross the Yellow River and highway interchange. The height of the pier is 105m, so the bridge has the typical characteristics of high pier and long-span, which add more difficulties in bridge design and construction control. This paper introduces the girder of main bridge and main pier size and conducts static calculation according to the construction phase. The Dynamic calculation includes the determination of earthquake fortification standard and earthquake input, determination of dynamic calculation model and the analysis of dynamic behavior of structure, the determination of anti-seismic performance target and verification principle. Fibrous unit division is made and seismic response and response spectrum analysis is carried out. The results show that the bridge meets relevant requirements of the code.

关键词

铁路桥梁/高墩大跨/连续刚构/设计

Key words

Railway bridge/High pier and long span/Continuous rigid frame/Design

分类

交通工程

引用本文复制引用

王克辉..兰合铁路刘家峡黄河特大桥主桥设计分析[J].铁道标准设计,2015,(8):88-91,92,5.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文