In long distance tunneling with large diameter air cushion slurry balance shield machine under different geolog-ical conditions, different degrees of wear on shield machine cutter will be produced; especially in sand and gravel based formation, the formation with excessive level of quartz and soft&hard formation, the cutter head and cutter are more easy to be worn.In order to ensure the safe use of shield machine cutter head, inspection and replacement of edge cutter and center cutter often should be done according to the different wear standards in the cabin with pressure.With an engineering case of cutter inspection/replacement in cabin with pressure for river channel construction, the paper summed up the con-struction technology of cutter inspection/replacement in cabin with pressure for large diameter shield.

关键词

过江隧道/大直径盾构/带压进仓/掌子面/泥浆/液位升降/查/换刀

Key words

river channel/large diameter shield/working in cabin with pressure/tunnel face/mud/liquid level fluctua-tion/cutter inspection/replacement