| 注册
首页|期刊导航|探矿工程-岩土钻掘工程|陈台沟铁矿复杂地层深孔钻探施工技术

陈台沟铁矿复杂地层深孔钻探施工技术

刘锡金

探矿工程-岩土钻掘工程Issue(10):41-44,4.
探矿工程-岩土钻掘工程Issue(10):41-44,4.

陈台沟铁矿复杂地层深孔钻探施工技术

Construction Technology for Deep Hole Drilling in Complex Formation of Chentaigou Iron Mine

刘锡金1

作者信息

  • 1. 辽宁省冶金地质勘查局402队,辽宁鞍山114002
  • 折叠

摘要

Abstract

The paper briefly introduces the lithology and structure construction in Chentaigou iron mine, induces 3 aspects of difficultis of collapse, block falling, water leakage, water inflow and diameter shrinkage affected by bad geological condi-tions;hole bending caused by strongly deflecting formation of thick phyllite and slipping formation encountered in deep drilling.The measures and methods are put forward to these 3 problems with good effects.

关键词

复杂地层/深孔钻探/陈台沟铁矿

Key words

complex formation/deep hole drilling/Chentaigou iron mine

分类

天文与地球科学

引用本文复制引用

刘锡金..陈台沟铁矿复杂地层深孔钻探施工技术[J].探矿工程-岩土钻掘工程,2014,(10):41-44,4.

探矿工程-岩土钻掘工程

2096-9686

访问量0
|
下载量0
段落导航相关论文