大同市某变电站下伏采空区的注浆加固治理
Grouting Reinforcement for Mined-out Area Underlying Substation in Datong
卢锋1
作者信息
- 1. 山西省地质勘查局217地质队,山西大同037008
- 折叠
摘要
Abstract
Based on the case of the treatment for mined-out area underlying a substation in Datong, the paper introduces the selection and implementation processes of the treatment methods for mined-out area treatment, discusses the design idea of the grouting reinforcement engineering and summarizes the solutions for various difficulties encountered in the construction with the successful experience presented.关键词
采空区/治理方法/注浆加固Key words
mined-out area/treatment method/grouting reiforcement分类
建筑与水利引用本文复制引用
卢锋..大同市某变电站下伏采空区的注浆加固治理[J].探矿工程-岩土钻掘工程,2014,(12):68-70,74,4.