首页|期刊导航|探矿工程-岩土钻掘工程|大同市某变电站下伏采空区的注浆加固治理

大同市某变电站下伏采空区的注浆加固治理

卢锋

探矿工程-岩土钻掘工程Issue(12):68-70,74,4.
探矿工程-岩土钻掘工程Issue(12):68-70,74,4.

大同市某变电站下伏采空区的注浆加固治理

Grouting Reinforcement for Mined-out Area Underlying Substation in Datong

卢锋1

作者信息

  • 1. 山西省地质勘查局217地质队,山西大同037008
  • 折叠

摘要

Abstract

Based on the case of the treatment for mined-out area underlying a substation in Datong, the paper introduces the selection and implementation processes of the treatment methods for mined-out area treatment, discusses the design idea of the grouting reinforcement engineering and summarizes the solutions for various difficulties encountered in the construction with the successful experience presented.

关键词

采空区/治理方法/注浆加固

Key words

mined-out area/treatment method/grouting reiforcement

分类

建筑与水利

引用本文复制引用

卢锋..大同市某变电站下伏采空区的注浆加固治理[J].探矿工程-岩土钻掘工程,2014,(12):68-70,74,4.