| 注册
首页|期刊导航|探矿工程-岩土钻掘工程|强岩溶地区主过水通道注浆封堵技术探讨

强岩溶地区主过水通道注浆封堵技术探讨

王伏春 乐应 白江红 江照

探矿工程-岩土钻掘工程Issue(2):76-79,4.
探矿工程-岩土钻掘工程Issue(2):76-79,4.

强岩溶地区主过水通道注浆封堵技术探讨

Discussion of Grouting Plugging Technology for Main Water Channel in Strong Karst Area

王伏春 1乐应 1白江红 1江照1

作者信息

  • 1. 湖北中南勘察基础工程有限公司,湖北武汉430081
  • 折叠

摘要

Abstract

Because of the characteristics of safety, environmental protection, economy and high efficiency, the mine curtain grouting has been successfully implemented in mines with good effects of water plugging.While in strong karst area, the water plugging effect will be directly influenced by the dynamic water grouting technique, especially by the plugging quality of main water channel, which is the key factor affecting the success of the project.With the background of a curtain grou-ting engineering in Fankou lead-zinc mine of Guangzhou, the paper discusses the grouting plugging technology for main wa-ter channel in strong karst area.

关键词

帷幕注浆/动水注浆/强岩溶地区/主过水通道/矿山堵水

Key words

curtain grouting/dynamic water grouting/strong karst area/main water channel/mine water plugging

分类

矿业与冶金

引用本文复制引用

王伏春,乐应,白江红,江照..强岩溶地区主过水通道注浆封堵技术探讨[J].探矿工程-岩土钻掘工程,2015,(2):76-79,4.

探矿工程-岩土钻掘工程

2096-9686

访问量0
|
下载量0
段落导航相关论文