福堂水电站震后厂房边坡锚索加固及应力监测与分析

李斌 黄芬

探矿工程-岩土钻掘工程Issue(5):67-71,76,6.
探矿工程-岩土钻掘工程Issue(5):67-71,76,6.

福堂水电站震后厂房边坡锚索加固及应力监测与分析

Slope Anchor Cable Reinforcement of Futang Hydropower Station after Earthquake and the Stress Monitoring A-nalysis

李斌 1黄芬1

作者信息

  • 1. 中国水利水电第十工程局有限公司基础工程分局,四川都江堰611830
  • 折叠

摘要

Abstract

After 5・ 12 earthquake in Wenchuan, the slope stability has been severely damaged in earthquake area, many destroyed modes appeared, such as collapse, landslide, deformation, and so on.Pre-stressed anchor cable is the main method of preventing high slope harm, with large tonnage pre-stressed cable anchoring in stable rocks of slope to resist the deep slope failure and deformation by pre-stressing.It is important to monitor the pre-stress variation, through the pre-stressed state monitoring both in and after construction process, the reinforcement effects can be tested and based on the long-term monitoring results to evaluate the slope stability state, whether to take appropriate remedial measures can be de-cided.According to the slope anchor cable reinforcement of Futang hydropower station after earthquake and the stress moni-toring, the paper discusses the stress loss of pressure-dispersive anchor and the variation rule.

关键词

地震/边坡加固/压力分散型锚索/锚索测力计/应力损失

Key words

earthquake/slope reinforcement/pressure-dispersive anchor/anchor dynamometer/stress loss