标准化工程总承包合同条件计价方式的讨论
Discussion on Valuation Methods of Standardized Engineering General Contract Condition
摘要
Abstract
Engineering general contract was one of these mainstream international engineering contracts. Besides, these standardized contarcts were arised at the same time and generally used lump-sum contract. Although this valuation method could take the advantage of engineering general contract, it might limit the application of the delivery method in a wider range. The paper introduced the silver leather book of FIDIC and characteristics, suitable areas and valuation method of these two standardization engineering general contracts promulgated by the Chinese government in 2011 were analyzed. Then characteristics of profit and risk distribution, as well as their scope of application were studied. These common problems in the popularization and application were pointed out. Especially, in order to promote the improvement of the engineering general contract condition, this research pointed out the way of improving the valuation method of standardized contract conditions. This research included that building one valuation method between the unit price contract and the total price contract. This valuation method not only could maintain motivation of total price contract to contractors, but also could make the advantage of the rational distribution of risk based on uint price contract. Obviously, achieving a two-goal win would be possible.关键词
工程总承包/合同条件/计价方式Key words
engineering general contract/contract condition/valuation method分类
管理科学引用本文复制引用
张坤,王卓甫,丁继勇..标准化工程总承包合同条件计价方式的讨论[J].土木工程与管理学报,2014,(4):98-102,5.基金项目
国家自然科学基金(71402045) (71402045)
中央高校基本科研业务费项目(2014B01314) (2014B01314)