Abstract

Several Chinese nuclear power plants are in earthquake-prone areas.Thus,slope failures due to earthquakes can disrupt the normal operation of nuclear power plants.Seismic design safety calculations for nuclear power plants take the advantage of computation methods such as the slip surface,the static finite element,and the dynamic finite element method.The current nuclear spec-ifications recommend using the three different methods of analysis that satisfy the regulatory re-quirements without giving additional guidance.Seismic slope stability analysis was used to exam-ine the intake tunnel of the Hongyan River nuclear power plant.The model boundary conditions for horizontal and vertical seismic motion were established.When the lower boundary is fixed, there is the effect of the vertical displacement on the lateral boundary.When the lower boundary for the horizontal seismic motion is fixed,there is the effect of the horizontal displacement on the lateral boundary.The input seismic data were taken from earthquake evaluation reports.The peak horizontal acceleration of the sl-2 ground motions is 0.18 g,and the vertical acceleration peak is 0. 12 g.The safety factor for the high slope and sliding surface position subjected to seismic loading is calculated first by the sliding surface method,and then by the static and dynamic finite element methods.Furthermore,the minimum safety factor and the minimum average safety factor of the slope are obtained according to the history curves of the safety factor.For vertical seismic motion, the sliding surface method and the static finite element method result in safety factor values of 1. 296 and 1.326,respectively.The minimum safety factor is 1.163.The results of the calculations and the analysis suggest reasonable improvement for the side slope.The cutting slope unloading scheme is necessary because the safety factor of the natural slope cannot satisfy the specifications of the seismic design code for nuclear power plants.For vertical seismic motion,the calculated ex-cavation slope safety factor with the sliding surface method is 1.524,whereas the safety factor cal-culated with the static finite element method is 1.508.The minimum safety factor calculated with the dynamic finite element method is 1.307.The calculated safety factor satisfies the code require-ments after the cutting slope unloading scheme is adopted.Evidently,the calculation methods can be used in the seismic slope stability analysis of similar conditions.

关键词

红沿河核电/高边坡/滑动面法/静力有限元法/动力有限元法/安全系数/稳定分析

Key words

Hongyan River nuclear power plant/high slope/sliding surface method/static finite element method/dynamic finite element method/safety factor/stability analysis

分类

建筑与水利

引用本文复制引用

赵杰,刘道勇,王桂萱..红沿河核电取水隧洞进水口高边坡抗震稳定分析[J].地震工程学报,2014,(2):214-219,227,7.

基金项目

辽宁省教育厅基金(2012-0102517);大连市科学技术基金(2010J21DW013). ()

地震工程学报

OA北大核心CSCDCSTPCD

1000-0844

访问量0
|
下载量0
段落导航相关论文