摘要

Abstract

Issues, occurred after the earthquake happened o May 12, 2008, on Qilingsi Hydropower Station are analyzed and summa-rized.Corresponding handling measures and schemes are raised.In combination with the actual works, feasibility and safety of these schemes are calculated and studied.

关键词

“5 .12”地震/工程除险/麒麟寺水电站

Key words

earthquake happed on May 12, 2008/hazard elimination by engineering measures/Qilingsi Hydropower Station

分类

建筑与水利

引用本文复制引用

孙万林,沈大伟,王智琦..麒麟寺水电站震后工程除险措施[J].西北水电,2014,(2):31-33,3.