| 注册
首页|期刊导航|西北水电|功果桥水电站碾压混凝土重力坝设计

功果桥水电站碾压混凝土重力坝设计

孙新庄 张华明 黄坚

西北水电Issue(4):37-41,5.
西北水电Issue(4):37-41,5.

功果桥水电站碾压混凝土重力坝设计

Design of RCC Gravity Dam, Gongguoqiao Hydropower Project

孙新庄 1张华明 1黄坚1

作者信息

  • 1. 中国水电顾问集团西北勘测设计研究院有限公司,西安 710065
  • 折叠

摘要

Abstract

In this paper, layout, section and structural design of RCC gravity dam of Gongguoqiao Hydropower Project are introduced. Based on the successful experience of many projects in China such as Longtan, Baise, Dachaoshan and Mianhuatan Hydropower Projects, etc, RCC (with 2-level aggregate particle sizes:5~20mm, 20~40mm, max.size 40mm) is adopted as the impervious barrier and the grout enriched vibrated concrete, as the impervious structure around the perimeter of the upstream framework.Compared with impervious structure with conventional concrete, this impervious design significantly increases the concrete placement speed of high dams.

关键词

碾压混凝土/重力坝/设计/景观/功果桥水电站

Key words

RCC gravity dam/design/landscape/Gongguoqiao Hydropower Project

分类

建筑与水利

引用本文复制引用

孙新庄,张华明,黄坚..功果桥水电站碾压混凝土重力坝设计[J].西北水电,2014,(4):37-41,5.