摘要

Abstract

The geological conditions of the surrounding rock of the slope where the surge chamber of Qirehatar Hydropower Project is exca-vated are weak.Once the lining leaks, the slope stability will be endangered.Furthermore, safety of the power plant at the foot of the slope will be threatened.Through demonstration, the following comprehensive scheme for seepage treatment is proposed:by application of the fibre concrete to be added, the strengthening grouting and the prestressed concrete lining, etc, the stability of the surge chamber slope and safety of the power plant are secured .

关键词

调压室/衬砌/渗水预应力/防渗设计

Key words

surge chamber/lining/seepage prestress/impervious design

分类

建筑与水利

引用本文复制引用

周志博,王立成,刘靖..齐热哈塔尔水电站调压室防渗设计研究[J].西北水电,2014,(4):51-53,3.

西北水电

1006-2610

访问量0
|
下载量0
段落导航相关论文