西北水电Issue(6):54-57,4.DOI:10.3969/j.issn.1006-2610.2014.06.014
陕西镇安抽水蓄能电站上水库库盆防渗型式比选研究
Study on Comparison and Selection of Impervious Modes for Upper Reservoir Basin, Zhen'an Pumped Storage Power Plant
李作舟1
作者信息
- 1. 陕西镇安抽水蓄能有限公司,西安710061
- 折叠
摘要
Abstract
The upper reservoir of Zhen'an Pumped Storage Power Plant is built with one dam to be constructed by utilization of the gulley in topography.At the dam site, both banks are steeper.The reservoir area is surrounded by mountains on three side.The mountains are higher and sound.The wholly enclosing conditions of the reservoir basin are better.The natural inflow discharge to the upper reservoir is a little.The reservoir seepage and evaporation both shall be compensated from the lower reservoir.The water volume is valuable.The rea-sonable selection of the impervious mode of the reservoir basin will not only affect the investment control but also be related to the safety and economic operation of the power plant after being built.Accordance with the construction conditions of the upper reservoir basin at the stage of the feasibility study, the impervious modes of the upper reservoir basin are compared in different views, proposing the scheme for the impervious treatment of the upper reservoir basin.关键词
抽水蓄能电站/上水库/库盆/防渗/方案Key words
pumped storage power plant/upper reservoir/reservoir basin/impermeability/scheme分类
建筑与水利引用本文复制引用
李作舟..陕西镇安抽水蓄能电站上水库库盆防渗型式比选研究[J].西北水电,2014,(6):54-57,4.