塞俄比亚 ADAMA 风机吊装项目成本控制综述

冯俊海

西北水电Issue(6):90-92,3.
西北水电Issue(6):90-92,3.DOI:10.3969/j.issn.1006-2610.2014.06.023

塞俄比亚 ADAMA 风机吊装项目成本控制综述

General Description of Cost Control of WTG Installation, Adama Wind Farm Project, Ethiopia

冯俊海1

作者信息

  • 1. 中国电建西北勘测设计研究院有限公司,西安710065
  • 折叠

摘要

Abstract

The main factors impacting the cost control of WTG installation of Adama Wind Farm, Ethiopia, are summarized such as pro-gress, machine lease charges, material cost, re-transport costs, etc as well as the corresponding measures for the cost control are raised. In the practice, the project cost is effectively controlled and the excellent results are achieved.This accumulates the engineering experi-ence on the implementation of wind farm development .

关键词

ADAMA/风机/吊装/成本控制

Key words

Adama/wind turbine/installation/cost control