彭水水电站导流洞混凝土封堵施工

高鄂湘 王刚

西北水电Issue(6):97-100,4.
西北水电Issue(6):97-100,4.DOI:10.3969/j.issn.1006-2610.2014.06.025

彭水水电站导流洞混凝土封堵施工

Plugging Construction of Diversion Tunnel, Pengshui Hydropower Project

高鄂湘 1王刚1

作者信息

  • 1. 中国水利水电建设工程咨询西北有限公司,西安 710065
  • 折叠

摘要

Abstract

During the construction of the permanent plug for the diversion tunnel of Pengshui Hydropower Project, leakage in a large quan-tity occurs at the transition section at the downstream of the Diversion Tunnel No.2 gate, resulting in water accumulated in the tunnel. The seepage flow is about 1.3 m3/s.Therefore, the temporary concrete plugs are proposed to build on both sides of the permanent plug to retaining the seepage so that the permanent plug can be constructed in dry condition.

关键词

导流洞/封堵/施工法/综述/彭水水电站

Key words

diversion tunnel/plugging/construction method/general description/Pengshui Hydropower Project

分类

建筑与水利

引用本文复制引用

高鄂湘,王刚..彭水水电站导流洞混凝土封堵施工[J].西北水电,2014,(6):97-100,4.

西北水电

1006-2610

访问量0
|
下载量0
段落导航相关论文