西北水电Issue(1):30-33,4.DOI:10.3969/j.issn.1006-2610.2015.01.008
某水电站定期冲洗式沉沙池设计研究
Study on Periodically Flushed Sand Trap
薛瑞 1蔺蕾蕾 1张淼 1黄蔚萍1
作者信息
- 1. 中国电建集团西北勘测设计研究院有限公司,西安 710065
- 折叠
摘要
Abstract
In accordance with data on sediment of one hydropower project, the design process of the periodically flushed sand trap is presen-ted.Through the proposed main control sizes of the sand trap, the settling velocity of the sand trap is calculated.Furthermore, the hydraulic parameters of the sand trap and a series of parameters such as ettling rate, sediment siltation and flushing of the sand trap are calculated by section and by time period, providing the design of the periodically flushed sand trap with strong basis.关键词
冲洗式沉沙池/沉速/沉降率/泥沙淤积/冲洗Key words
flushed sand trap/settling velocity/settling rate/sediment siltation/flushing分类
建筑与水利引用本文复制引用
薛瑞,蔺蕾蕾,张淼,黄蔚萍..某水电站定期冲洗式沉沙池设计研究[J].西北水电,2015,(1):30-33,4.