摘要

Abstract

In accordance with data on sediment of one hydropower project, the design process of the periodically flushed sand trap is presen-ted.Through the proposed main control sizes of the sand trap, the settling velocity of the sand trap is calculated.Furthermore, the hydraulic parameters of the sand trap and a series of parameters such as ettling rate, sediment siltation and flushing of the sand trap are calculated by section and by time period, providing the design of the periodically flushed sand trap with strong basis.

关键词

冲洗式沉沙池/沉速/沉降率/泥沙淤积/冲洗

Key words

flushed sand trap/settling velocity/settling rate/sediment siltation/flushing

分类

建筑与水利

引用本文复制引用

薛瑞,蔺蕾蕾,张淼,黄蔚萍..某水电站定期冲洗式沉沙池设计研究[J].西北水电,2015,(1):30-33,4.

西北水电

1006-2610

访问量0
|
下载量0
段落导航相关论文