西北水电Issue(1):73-76,4.DOI:10.3969/j.issn.1006-2610.2015.01.019
水电厂安稳装置拒动案例分析研究
Analysis and Study on Reject Action of Safety and Stability Devices in Hydropower Plant
段云丰 1邹伦森 1乔杨2
作者信息
- 1. 中国南方电网调峰调频发电公司鲁布革水力发电厂,云南省罗平县 655800
- 2. 国电联合动力技术有限公司,北京 100039
- 折叠
摘要
Abstract
Through analysis on one accident which the safety and stability device refuses to act because the improper parameter setting for the time of twittering prevention is input in the internal switching quantity of the non electricity quantity of one generator-transformer set.Simul-taneously, corresponding measures are provided to avoid the repeat of the similar accident.This provides the parameter setting of the same devices with reference.关键词
水电厂/安稳装置/非电量Key words
hydropower plant/safety and stability device/non-electricity quantity分类
建筑与水利引用本文复制引用
段云丰,邹伦森,乔杨..水电厂安稳装置拒动案例分析研究[J].西北水电,2015,(1):73-76,4.