Abstract
Ice has to be removed for the water-diverted power station in cold region in winter when the power station generates.In consid-eration of the sustainable development demand of the water-diverted power stations in northern Xinjiang region, the ice-removal measures shall be provided when the power station is designed for this region.The ice-removal measures for the water-diverted power stations in winter are concluded in engineering design as well as advantages , disadvantages and application scope of these measures are demonstrated in this paper .关键词
引水式电站/冬季/排冰/措施Key words
water-diverted power station/winter/ice removal/measure分类
天文与地球科学引用本文复制引用
丁磊..新疆北疆地区引水式电站冬季排冰措施[J].西北水电,2015,(3):36-38,3.