| 注册
首页|期刊导航|西北水电|新疆北疆地区引水式电站冬季排冰措施

新疆北疆地区引水式电站冬季排冰措施

丁磊

西北水电Issue(3):36-38,3.
西北水电Issue(3):36-38,3.DOI:10.3969/j.issn.1006-2610.2015.03.010

新疆北疆地区引水式电站冬季排冰措施

Ice-removal Measures for Diverted Power Stations in Northern Xinjiang in Winter

丁磊1

作者信息

  • 1. 新疆勘测设计院 集团 有限责任公司石河子分公司,新疆石河子 832000
  • 折叠

摘要

Abstract

Ice has to be removed for the water-diverted power station in cold region in winter when the power station generates.In consid-eration of the sustainable development demand of the water-diverted power stations in northern Xinjiang region, the ice-removal measures shall be provided when the power station is designed for this region.The ice-removal measures for the water-diverted power stations in winter are concluded in engineering design as well as advantages , disadvantages and application scope of these measures are demonstrated in this paper .

关键词

引水式电站/冬季/排冰/措施

Key words

water-diverted power station/winter/ice removal/measure

分类

天文与地球科学

引用本文复制引用

丁磊..新疆北疆地区引水式电站冬季排冰措施[J].西北水电,2015,(3):36-38,3.

西北水电

1006-2610

访问量0
|
下载量0
段落导航相关论文