西藏尼洋河多布水电站工程截流设计

范巍

西北水电Issue(3):65-66,70,3.
西北水电Issue(3):65-66,70,3.DOI:10.3969/j.issn.1006-2610.2015.03.018

西藏尼洋河多布水电站工程截流设计

Design of River Closure of Duobu Hydropower Project in Tibet

范巍1

作者信息

  • 1. 中国水电基础局有限公司,天津 301700
  • 折叠

摘要

Abstract

In accordance with features of deep and thick overburden, stratum requiring low flow velocity against washing away, and combi-nation of river closure dike and sandy gravel dam, such proper measures as properly enlarging closure gap width, closure gaps on both banks wrapped and providing reinforcement cages on riverbed, and providing certain washing distance are taken to achieve expected river closure result.

关键词

截流/分区抛填料/预留冲距/多布水电站

Key words

river closure/fill embankment material in zone/provide washing distance/Duobu Hydropower Project