西北水电Issue(3):65-66,70,3.DOI:10.3969/j.issn.1006-2610.2015.03.018
西藏尼洋河多布水电站工程截流设计
Design of River Closure of Duobu Hydropower Project in Tibet
范巍1
作者信息
- 1. 中国水电基础局有限公司,天津 301700
- 折叠
摘要
Abstract
In accordance with features of deep and thick overburden, stratum requiring low flow velocity against washing away, and combi-nation of river closure dike and sandy gravel dam, such proper measures as properly enlarging closure gap width, closure gaps on both banks wrapped and providing reinforcement cages on riverbed, and providing certain washing distance are taken to achieve expected river closure result.关键词
截流/分区抛填料/预留冲距/多布水电站Key words
river closure/fill embankment material in zone/provide washing distance/Duobu Hydropower Project分类
建筑与水利引用本文复制引用
范巍..西藏尼洋河多布水电站工程截流设计[J].西北水电,2015,(3):65-66,70,3.