基于 FLAC3D的深基坑开挖变形数值模拟研究

杨博维

水资源与水工程学报Issue(2):24-28,5.
水资源与水工程学报Issue(2):24-28,5.DOI:10.11705/j.issn.1672-643X.2014.02.05

基于 FLAC3D的深基坑开挖变形数值模拟研究

Research on numerical simulation of excavation deformation of deep foundation pit based on FLAC3D

杨博维1

作者信息

  • 1. 辽宁工程技术大学土木与交通学院,辽宁阜新123000
  • 折叠

摘要

Abstract

Combined with practical underground project ofⅡarea foundation pit of comprehensive traffic hub of Shenyang north station , the paper simulated the process of foundation pit excavation under four different support schemes by using the finite difference software FLAC 3D ,and analyzed the displacements of slope top and bottom of foundation pit and horizontal displacement of foundation pit wall caused by four types of excavation process .The simulation results show that the bottom uplift is caused by the vertical unloading ,the concrete support pile and pre -stressed anchor cable can effectively control the deformation of foundation pit .The research results and engineering practice prove that support scheme of the project is effective and feasible .

关键词

基坑/FLAC3D/变形分析/支护结构

Key words

foundation pit/FLAC3D/deformation analysis/supporting structure

分类

建筑与水利

引用本文复制引用

杨博维..基于 FLAC3D的深基坑开挖变形数值模拟研究[J].水资源与水工程学报,2014,(2):24-28,5.