摘要
Abstract
Influenced by meteorological and hydrographical factors at sea ,the objective in distress may drift apart from the initial spot .Therefore , the scheduling scheme for rescue resources has to be organized accordingly .Be-cause of the particularity of maritime peril and rescue at sea , based on the forecast for the drifting route of the ob-jective in distress , this paper aims to present a two-phase collaborative scheduling model for rescue resources a-round the objective in distress from sea and inland respectively , which includes the navigating ships nearby , coastal rescue bases and inland depots of contingent commodities , under the restrains of requirements of demand and time limit.Finally, the greedy algorithm is designed to solve the model and its validity is examined by a nu-merical example .关键词
管理科学与工程/多层级协同调度/贪婪算法/水上漂移目标Key words
management science and engineering/collaborative scheduling model with multi-layer/greedy algorithm/drifting objective in distress at sea分类
资源环境