高炉鼓风机防喘系统控制程序优化改造
Upgrading of the Control Program for Anti-surge System of Blast Furnace Blower
段伦俊1
作者信息
- 1. 山东钢铁莱芜分公司能源动力厂,山东莱芜271104
- 折叠
摘要
Abstract
The performance of the Yingqian No.1 generator unit of Laiwu Steel’s power plant did not match the operation conditions of the blast furnaces. In order to ensure normal and stable production of the blast furnaces, through optimizing transformation of the control program for the anti-surge system the performance of No.1 generator unit was improved and production cost reduced.关键词
高炉/风机工况/改造Key words
blast furnace/condition of the blower/transformation分类
机械制造引用本文复制引用
段伦俊..高炉鼓风机防喘系统控制程序优化改造[J].冶金动力,2015,(6):39-41,3.