| 注册
首页|期刊导航|岩土工程学报|坑道瞬变电磁全程数据分析及1∶1含水模型试验研究

坑道瞬变电磁全程数据分析及1∶1含水模型试验研究

胡雄武 张平松 吴荣新 李培根 付茂如

岩土工程学报Issue(11):2103-2109,7.
岩土工程学报Issue(11):2103-2109,7.DOI:10.11779/CJGE201411017

坑道瞬变电磁全程数据分析及1∶1含水模型试验研究

All-time data analysis of transient electromagnetic method for tunnels and investigation on 1∶1 water model

胡雄武 1张平松 1吴荣新 1李培根 2付茂如1

作者信息

  • 1. 安徽理工大学地球与环境学院,安徽 淮南 232001
  • 2. 福州华虹智能科技开发有限公司,福建 福州 350004
  • 折叠

摘要

Abstract

Considering the transition of receiving system and the turn-off time of currents, the expressions for impulse response function, primary electromotive force and secondary all-time induced electromotive force are derived. On this basis, the all-time response signals received by receiving coil are restored. The comparative analysis of the receiving and theoretical all-time data shows that the turn-off time of currents and the transition of receiving system distort the early and middle window time data, resulting in undistinguishable electrical information obtained by data processing in short range ahead of tunnels. To assess the impact of aberration data on the advanced water detection in a tunnel, a 1:1 quantitative sump model ahead of the tunnel is established. Through the continuous observation and analysis of the transient field data in different water less than 100 m3, the transient exception response characteristics of water are obtained. It is shown that the response time of the water model is within the time range of the aberration data, and it is further indicated that the technology of advanced water detection must be improved to increase the advanced forecast accuracy.

关键词

瞬变电磁/坑道超前探水/全程响应/畸变数据/近距离地电信息/1∶1含水模型

Key words

transient electromagnet/advanced water detection in tunnel/all-time response/aberration data/short-range electrical information/1∶1 water model

分类

建筑与水利

引用本文复制引用

胡雄武,张平松,吴荣新,李培根,付茂如..坑道瞬变电磁全程数据分析及1∶1含水模型试验研究[J].岩土工程学报,2014,(11):2103-2109,7.

基金项目

国家自然科学基金重点项目(51134012);高等学校博士学科点专项科研基金项目 ()

岩土工程学报

OA北大核心CSCDCSTPCD

1000-4548

访问量0
|
下载量0
段落导航相关论文