廖文来 张君禄 陈晓文 段峰虎 黎兴

岩土工程学报Issue(z2):460-465,6.
岩土工程学报Issue(z2):460-465,6.DOI:10.11779/CJGE2014S2080

湛江湾厚砂层深挖竖井结构施工监测分析

Monitoring analysis of structural construction of deep thick sand shaft in Zhanjiang Bay

廖文来 1张君禄 2陈晓文 1段峰虎 2黎兴1

作者信息

  • 1. 广东省水利水电科学研究院,广东广州 510610
  • 2. 广东省岩土工程技术研究中心,广东广州 510610
  • 折叠

摘要

Abstract

To master the development and distribution of internal forces in the shaft structure to guide earth excavation and lining construction, dynamometers are installed on the reinforcement at different elevations in different directions in the shaft structure to measure the force so as to monitor changes of the internal forces in the shaft structure during the construction period. The monitoring results show that the shaft structure is mainly in a compressed state during the construction period. The circumferential pressure of the shaft structure is greater than the vertical one at the same elevation. The structural stress in the center of diaphragm wall structure is greater than that in the substructure, and the circumferential pressure in the substrucure of the lining wall is greater than that in the center. The earth excavation and lining construction is performed according to the section of six meters in length. The structurale force is the maximum when constructed to the fifth and sixth floor. The calculated results show that the safety factor of structure is within the allowable range. The monitoring results provide guidance for the earth excavation and lining construction, and they also provide a reference for the monitoring, design and construction of other similar shafts.

关键词

湛江湾/厚砂层/深挖竖井/施工监测

Key words

Zhanjiang Bay/thick sand bed/deep shaft/construction monitoring

分类

建筑与水利

引用本文复制引用

廖文来,张君禄,陈晓文,段峰虎,黎兴..湛江湾厚砂层深挖竖井结构施工监测分析[J].岩土工程学报,2014,(z2):460-465,6.

岩土工程学报

OA北大核心CSCDCSTPCD

1000-4548

访问量0
|
下载量0
段落导航相关论文