兰州地铁车站深基坑开挖过程中降水对邻近地下管道的影响

周勇 锜魏嵩 朱彦鹏

岩土工程学报Issue(z2):495-499,5.
岩土工程学报Issue(z2):495-499,5.DOI:10.11779/CJGE2014S2086

兰州地铁车站深基坑开挖过程中降水对邻近地下管道的影响

Effects of dewatering on adjacent underground pipelines during excavation of deep foundation pit at a metro station in Lanzhou

周勇 1锜魏嵩 2朱彦鹏1

作者信息

  • 1. 兰州理工大学甘肃省土木工程防灾减灾重点实验室,甘肃兰州 730050
  • 2. 西部土木工程防灾减灾教育部工程研究中心,甘肃兰州 730050
  • 折叠

摘要

Abstract

Taking the deep foundation pit at a subway station of Lanzhou metro line 1 as an example, the displacement of the underground pipes induced by its dewatering is comprehensively analyzed. Using piles and internal bracing structures to support the deep foundation pit and considering dewatering during the whole excavation process, a three-dimensional finite element model is established by using the FEM software ADINA. The FEM analysis and monitoring data show that the deep excavation and dewatering have significant effects on the displacement of underground pipelines. Accordingly the deformation of the pipelines is summarized, so as to provide an important basis for the design and construction of Lanzhou subway stations and similar deep foundation pits.

关键词

深基坑/地铁车站/有限元法/基坑降水/位移

Key words

deep foundation pit/subway station/FEM/dewatering/displacement

分类

建筑与水利

引用本文复制引用

周勇,锜魏嵩,朱彦鹏..兰州地铁车站深基坑开挖过程中降水对邻近地下管道的影响[J].岩土工程学报,2014,(z2):495-499,5.

基金项目

甘肃省自然科学基金项目(1208RJZA158);兰州理工大学红柳青年教师培养计划项目(Q20110B);甘肃省高等学校基本科研业务费项目 ()