田湾核电站18个月换料燃料管理策略

李友谊 杨晓强 姚进国 王汗 董超 李宝库

原子能科学技术Issue(11):2072-2077,6.
原子能科学技术Issue(11):2072-2077,6.DOI:10.7538/yzk.2014.48.11.2072

田湾核电站18个月换料燃料管理策略

Fuel Management Scheme on 18 Months Refueling for Tianwan Nuclear Power Station

李友谊 1杨晓强 1姚进国 1王汗 1董超 1李宝库1

作者信息

  • 1. 中国核电江苏核电有限公司,江苏连云港 222042
  • 折叠

摘要

Abstract

To realize long period refueling for Tianwan Nuclear Power Station (TNPS) units 1 and 2 ,the fuel management scheme on transition to 18 months refueling was worked out .Referring to management experience in Russian nuclear power station ,the long period refueling project shall adopt the new type fuel assembly TVS‐2M .Before formal transition to long period fuel cycle ,the mixed core compatibility was verified by the operation of pilot TVS‐2M fuel assemblies .TVS‐2M fuel assemblies replaced AFA fuel assemblies in two steps ,namely ,TVS‐2M with blanket was loaded in the first two transition cycles ,and TVS‐2M without blanket was loaded in the subsequent cycles . The two TNPS units are scheduled to gradually increase operation length and finally reach 480 effective full‐power day (EFPD) in four transition fuel cycles .Transition fuel cycles and equilibrium fuel cycles were all designed to adopt the part‐low‐leakage core fuel loading ,w hich can reduce neutron irradiation to reactor pressure vessel .Fuel man‐agement schemes on 18 months refueling for TNPS enhance units capacity factor and economy ,and have flexible cycle length .

关键词

田湾核电站/T VS-2M燃料组件/燃料管理/18个月换料

Key words

Tianwan Nuclear Power Station/TVS-2M fuel assembly/fuel manage-ment/18 months refueling

分类

能源科技

引用本文复制引用

李友谊,杨晓强,姚进国,王汗,董超,李宝库..田湾核电站18个月换料燃料管理策略[J].原子能科学技术,2014,(11):2072-2077,6.